After use, perform a zero position calibration before powering off and storing the robotic arm. Tidy up and organize all wire harnesses to avoid entanglement or excessive pulling.
Operating and Storage Environmental Requirements: Temperature:-20 to 50 ℃, Humidity:25% to 85% non-condensing.
Maintenance and servicing must be performed when the robotic arm is in a zero-reset and power-off state. After powering-off, perform the following operations:
Note: Robotic Arm Cleaning: Use wet wipes or dry rags dampened with water to remove dust, dirt, and oil stains from the robotic arm.Motor Inspection: Check for damage or deformation of the motor and its structural components.Cable Inspection: Check for the security of power cables and CAN cables, and any damage to their outer sheaths.
In case of an emergency, you can unplug the aviation connector directly to cut off the power supply. Note that the robotic arm will be deactivated and drop directly after power-off. Take extreme care to prevent damage to the robotic arm, as well as harm to the surrounding environment and personnel. Power off by unplugging the connector is an emergency response measure only, and is not intended to prevent injury.
<aside> <img src="/icons/home_orange.svg" alt="/icons/home_orange.svg" width="40px" />
Home Page: Nero Robot Arm
</aside>
<aside> <img src="/icons/arrow-right_orange.svg" alt="/icons/arrow-right_orange.svg" width="40px" />
Next Page: Appendix: Dimension Drawings
</aside>